Home » Projects » Cases » Dalian Mingshi International Project

Dalian Mingshi International Project

Views: 0     Author: Site Editor     Publish Time: 2025-03-14      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
sharethis sharing button

6

6
Project Dalian Mingshi International Project
Project problems Solutions
Insufficient parking space in the city core It adopts a flat mobile garage, three-dimensional development of vertical space, and a three-layer design to improve space utilization and alleviate parking problems.
High vehicle access efficiency requirements Configure an intelligent dispatching system to optimize vehicle movement paths, shorten bicycle storage (retrieval) time, and improve utilization efficiency.
Project advantage
1. Efficient storage and access: Planar mobile technology realizes automated scheduling, reduces manual intervention, and improves vehicle storage and access speed.

2. Space optimization: The three-layer steel structure design makes full use of vertical space and increases parking capacity by 2 times compared to traditional parking lots.

3. Intelligent management: Integrated intelligent control system supports remote monitoring and parking guidance to improve user parking experience.
Project profile
Construction site Dalian Type of vehicle suitable for parking Car/SUV
Main building type Residential Apartments Car size (mm) 5000×1850×1550
Parking space 42 Device type Automatic parking system
Number of floors 3 Control mode PLC
Garage structure type Steel Structure Parking equipment manufacturer Jiangsu Fengye Parking System Co., Ltd.


Quick Links

Product Category

Contact Us

 No. 58 Yishan Road, Shengang Street, Jiangyin
WhatsApp:+86-18921156522
Get In Touch
Copyright © 2024 Jiangsu Fengye Parking System Co., Ltd. | Sitemap | Support by leadong.com | Privacy Policy  苏ICP备16052870号-4